With the CHANCE helical pier solution, there are no holes to drill and no delays because there is no grout. In cohesive soils, there is no need for belled and/or long sockets and in non-cohesive soils, there are no casings or grouted sockets. There is a typical production rate of 30-40 per day. Terminations can be set according the type of all thread bar (if needed) or the existing bolt hole can be utilized as a termination mechanism for wall's steel structure.